Film Archive And Preservation Center
Blois work included the complete installation of the storm drain, sewer, domestic water and fire water system for this facility designed to preserve classic and historical movies and films that deteriorate over time. Storm drains system included extensive subdrainage on the “living roof” of the facility and multiple sizes. Sewer lines were installed in very difficult circumstances, in conjunction with building shoring and up to depths of 30 feet.
Project Details
Work With Us- Location: Santa Clarita, CA
- Owner: The Packard Humanities
- General Contractor: Morley Construction Company
- Contract Size: $ 1,195,441